È Fasten the "ENGINE STOP"
button lead and sub wire har-
ness to the frame at the pro-
tecting tube for the "ENGINE
STOP" button lead with a plas-
tic locking tie and cut off the tie
end.
Ô Fasten the sub wire harness
and hot starter cable to the
frame at the white tape for the
sub wire harness with a plastic
locking tie and cut off the tie
end.
Fasten the sub wire harness to
the frame with a plastic locking
tie and cut off the tie end.
Ò Pass the sub wire harness
between the engine brackets.
◊
G
F
D
D-D
9
‰
8
Ì
CABLE ROUTING DIAGRAM
˜ Make sure that the TPS cou-
pler does not go outside the
chassis.
ˆ Fasten the TPS lead to the
frame with a plastic band.
Ø Fasten the neutral switch lead
and oil hose together with a
plastic locking tie and cut off
the tie end.
∏ Fasten the neutral switch lead
to the frame with a plastic
band.
Œ Fasten the neutral switch lead,
CDI magneto lead and radiator
breather hose to the frame with
a plastic band.
E
F
D
C-C
1
Å
‰
7
Ï
‰
Î
6
5
Ç
4
Ê
A
Í
G
D
Â
A
2
3
ı
Œ
A
C
2 - 22
SPEC
 Fasten the neutral switch lead,
CDI magneto lead and radiator
breather hose to the frame with
a plastic locking tie and cut off
the tie end.
Í Pass the neutral switch lead,
CDI magneto lead and radiator
breather hose between the
radiator and frame.
Ê Fasten the neutral switch lead
and CDI magneto lead to the
cable guide at their protecting
tubes with a plastic locking tie
and cut off the tie end.
Ë Pass the carburetor breather
hoses and overflow hose so
that all there hoses do not con-
tact the rear shock absorber.
0
Ó
A
B
A
È
A
Ô
A
B
D
C
F
∏
A
E
A
Ø
H
I
H
A
A
B
0
B
Ò
A
˜
A
ˆ
C
D
Ë