Maico ECA 100 ipro Instructions De Montage Et Mode D'emploi page 20

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

UK │ 9. Installation, operating programs
Night program
● Performance level 2 while room is being
used, performance level 1 during overrun
time.
● J4 open, J5 open
Economy program
● Performance level 1 during operation and
overrun.
● J4 open, J5 bridged
Power program
● Performance level 2 during operation and
overrun.
● J4 bridged, J5 open
20
2. Fit electronics cover.
NOTICE
Danger of short circuits and damage to
unit! Humidity will penetrate if
electronics cover is not used correctly.
 Press electronics cover firmly onto
housing such that it is sealed and flush all
the way around. Do not press setting
buttons [11] and [12].
3. Insert electronics cover into housing
recesses I, II and III with the 3 latches
until they snap into place. Press the
electronics cover firmly on to the housing
at the points indicated by the arrows.
4. For unit versions F, KF, H, KH, B and KB,
insert the sensor supplied [9] in the correct
position ( arrow X) in the connector base.
Please note for the versions H and KH
that the membrane located on the flat
side of the sensor housing must not be
exposed to mechanical stress.
5. Fit cover [6].
6. Set start delay and overrun time in
accordance with Chapter 9.5.
7. Fit designer cover [7] ( fold out page,
Fig. B).

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Eca 100 ipro vzcEca 100 ipro fEca 100 ipro hEca 100 ipro bEca 100 ipro kEca 100 ipro kvzc ... Afficher tout

Table des Matières