Electrical Connection; Operating Programs - Maico ECA 100 ipro Instructions De Montage Et Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

6. Guide power cable into connection area
such that the cable grommet
fits around the cable sheathing completely
and does not penetrate too far into the
connection area.

9.2 Electrical connection

NOTICE
Unit damage in the case of short-circuits.
 Insulate PE conductor and unneeded
cable cores.
 Do not touch electric components.
1. Switch off mains fuse, secure against
being accidentally switched back on and
position a warning sign.
2. Only lay single cable cores in the unit. To
do this, reduce power cable sheathing to a
length of 100 mm. Strip single cable cores
to 9 to 10 mm.
3. Insert housing [1] into wall breakthrough/
wall sleeve and secure with two screws.
Do not insert the housing such that it is
twisted or crushed. Make sure you use
mounting material which is sized for the
purpose.
4. Electrically connect power cable to spring
clip [13] according to connection wiring
diagram [14], also see wiring diagrams in
Chapter 16.
ECA 100 ipro standard model units
can be operated at two levels with
double switches. Without a double
switch, the fan can either be opera-
ted at performance level 1 or perfor-
mance level 2, see switch variants in
Chapter 16.
9. Installation, electrical connection │ UK
5. Check position of cable grommet. It must
be well sealed.
6. If necessary, connect a speed controller
(STX 1,5).
The technology used in the phase
angle controller may cause
humming noises.

9.3 Operating programs

● VZC, KVZC, F, KF, B and KB: One of the
4 following operating programs can be set
with jumpers J4 and J5.
● H and KH: One of the 4 following opera-
ting programs can be set with jumpers J4
and J5 and the light switch connected in
accordance with chapter 15. If this is
switched on, it takes priority over the
automatic humidity process.
● Comfort program (supplied in this mode),
night program, economy program and
power program
1. Set the operating program you want with
jumpers J4 and J5.
Comfort program
● Performance level 1 while room is being
used, performance level 2 during overrun
time.
● J4 bridged, J5 bridged
19

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Eca 100 ipro vzcEca 100 ipro fEca 100 ipro hEca 100 ipro bEca 100 ipro kEca 100 ipro kvzc ... Afficher tout

Table des Matières