Pentair STA-RITE CPS 10 Serie Instructions De Service page 41

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 44
8.3 INSTALLATION OF THE POSITIVE SUCTION HEAD
1) Basin or tank
2) Float
3) Shut-off valve
4) Outlet tubing
For the installation of the positive suction head, ensure the correct inclination of the suction piping until the air present in the tubing
can exit the outlet tubing.
5) Tank/autoclave membrane (8 l/min)
6) Gauge
7) Pressure transducer
8) Flexible tube
9) Non return valve
10) Filter
11) Motor pump complete with inverter
EN
39

Publicité

Table des Matières
loading

Table des Matières