Maintenance; Suggestion For Winter Conditions - Speck pumpen BADU Jet PRIMAVERA Installation

Masquer les pouces Voir aussi pour BADU Jet PRIMAVERA:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 87

9 Maintenance

9
Maintenance
When?
Regularly
If there is a chance
of frost
The cover and the handle of the BADU
stainless steel. Due to the various water components the parts have to
be cleaned periodically to avoid possible corrosive damage.
9.1

Suggestion for winter conditions

For outdoor counter swim units that could be subjected to frost during
the winter.
82 EN
VG 766.2320.050
Before maintenance work, close all valves and drain all pipes.
What?
After completing all maintenance work, perform all necessary
measures for start-up.
Lower the water level of the pool down to the lower edge of the inlet
connection.
The pump should be removed during the frost period and stored in a
dry room.
Leave the shut-off valves half open so that the housing and lines
can drain.
Support the suction and pressure lines to relieve them.
Water caused by rain can drain through the half-opened shut-off
valves to the waste duct.
Remove foreign matter from the suction
opening.
Drain pump and pipes sensitive to frost
before temperatures drop below freezing.
®
Jet primavera are made of
Support
12/2014

Publicité

Table des Matières
loading

Table des Matières