Installation; Installation Site; Outdoor Installation; Ground Drain (Has To Exist) - Speck pumpen BADU Jet PRIMAVERA Installation

Masquer les pouces Voir aussi pour BADU Jet PRIMAVERA:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 87
5

Installation

5.1

Installation site

5.1.1

Outdoor installation

5.1.2

Ground drain (has to exist)

5.1.3

Aeration and ventilation

5.1.4

Structure-borne and airborne noise transmission

5.1.5

Reserve space

5.1.6

Fasteners

12/2014
VG 766.2320.050
In order to increase the pump's service life, provide simple weather
protection.
Measure the size of the ground drain according to the following
criteria:
– Size of the swimming pool
– Circulation flow rate
Ensure sufficient aeration and ventilation. Aeration and ventilation
must ensure the following conditions:
– Prevention of condensation
– Minimum distance from fan cover to the wall: 110 mm
– Cooling of the pump motor and other system components
(e.g. switch cabinets and control units)
– Limitation of the ambient temperature to max. 40 °C
Observe regulations for structural noise protection (e.g. DIN 4109).
Install the pump in a manner which reduces structure-borne and
airborne noise transmission. Vibration-absorbing materials are
suitable bases. Examples:
– Anti-vibration buffers
– Cork lining
– Sufficient hard foam
Provide enough reserve space so that the pump can be removed in
the direction of the motor fan.
Fasten pump by using screws.
5 Installation
EN 59

Publicité

Table des Matières
loading

Table des Matières