4.2 MOUNTING
The 8223 conductivity sensor is installed on a pipe as follows:
- Insert the nut [4] on the fitting [6] and clip the ring [3] in the groove [5].
- Insert the sensor [1] into the fitting [6] by ensuring the gasket [2] is in its right place.
- Screw on the nut and tighten by hand only.
- Ensure the gasket material (FKM in standard) is chemically compatible
with your process.
- One EPDM gasket and one FKM gasket are additionally supplied with
the sensor.
- Make sure the gasket is not damaged when replacing it.
INSTALLATION
1
2
3
4
5
6
14
8223