Assembly
Compact control panel 2A/M
Wall mounting :
1.
First remove the baseplate with control electronics.
2.
Fix the housing through mounting holes with suitable
plugs and screws to the wall.
3.
Encase the baseplate back.
Note: The control system must be fitted in a
dry area at a place that is easily visible and
accessible.
No overhhead installation or rotated by 180°
mounting.
The control system must not be hidden by wall
projections, doors or structures.
Assembly:
Once the housing has been fastened to the wall:
1.
Thread velcro tapes for attaching the rechargeable
batteries into the assembly panel.
Attention: Start up procedure of the control panel
only with installed plexiglass cover.
Note: The Control panel is also available with a
UP-mounting kit.
Inserting the rechargeable batteries
1.
With the help of the velcro tapes C (in the bottom part
of the baseplate), fasten the rechargeable batteries
on the underside of the control panel.
2.
Connect the rechargeable batteries together according
to the connection diagram below.
3.
Place the battery connection cables on the control board
using the plug-in screw terminal.
Attention: Ensure the correct polarity on the batteries!
13/24999513
SHE control panel TRZ Plus 2A and TRZ Plus Comfort;
Compact control panel 2A and Compact control panel 2A/M
250
250
Rechargeable batteries with
velcro tapes
C
rd. 6,1
71