Renishaw RP1 Mode D'emploi page 15

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

RP2/RP2 DD INSTALLATION dimensions mm (in)
NOTE It is essential that design of the probe installation prevents coolant from contacting the rear of
the probe.
RP2 probe
M4 x 0,7
➤ ➤ ➤ ➤ ➤
➛ ➛ ➛ ➛ ➛
FACE B
See Note 2
RP2 DD probe
M4 x 0,7
➤ ➤ ➤ ➤ ➤
NOTES
1. Side lead exit may be in any position
on diameter marked thus XXXXXXXXX.
2. Ensure face B of module body is
flush within 0.2 mm (0.008 in) of face C
of housing on installation.
3. To secure probe during installation, lock
M5 flat end grubscrews (2 off, supplied by
user) into location c/sinks in probe body.
Location
c/ sink
Ø30,05
Ø30,00
(1.183
1.181)
5,6
5,4
(0.22
0.21)
D D D D D
0,8
20°
4
(0.16)
Ø28,90
Ø28,80
(1.138
1.134)
0,8
A
0,5 x 45°
FACE C
See Note 2
2 holes M5 x 0,8
to depth shown
See Note 3
D D D D D
30 (1.18)
28 (1.10)
Ø24
minimum
(0.94)
16,6 (0.65)
minimum
Ø8
(0.31)
minimum lead exit
8,5
8,3
(0.33
SECTION D - D
0.32)
1-5

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Rp2

Table des Matières