Tools And Materials Required; Remove The Packaging - Monogram ZV950 Instructions D'installation

Hotte en acier inoxydable de 36 po
Masquer les pouces Voir aussi pour ZV950:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

TOOLS AND MATERIALS REQUIRED (NOT SUPPLIED)
■ T ape measure
■ K nife
■ S pirit level
■ W ire cutter/stripper
■ W ire nuts
■ E lectric drill with 1/8" and 3/8" bits
■ P hillips and flat blade screwdrivers
■ H ammer
■ P liers

REMOVE THE PACKAGING

The hood is shipped secured to a shipping board with (4)
screws. Remove the 4 screws. Two screws are located
at the top of the hood. Two are located at the bottom of
the hood behind the grease filters.
A shipping bracket, which supports the blower, must
also be removed. It is secured with two screws. All screw
impressions are Phillips.
■ R emove all packaging, the duct covers, and
accessories.
■ L ift the hood out of the carton.
■ R emove and properly discard all plastic wrapping..
Junction
Top Shipping Screws
Box
1" = 2.5 cm; 1' = 0.3 m
31-14900 Rev. 2
Installation Preparation
Top Of Hood
■ S afety glasses
■ D uct tape
■ T ape to mount template
■ G loves to protect against sharp edges
■ 1 20V 60Hz. 15 or 20 Amp, 2 wire with ground Properly
grounded branch circuit
■ S train relief for junction cover
■ 8 " round metal duct, length to suit installation
Remove Bottom Shipping
Screws and Shipping Bracket
■ R emove junction box cover.
■ I nstall strain relief into junction box cover.
Shipping Board
7

Publicité

Chapitres

Table des Matières
loading

Table des Matières