Repacking - Mustang Survival MD3153 V.F.I. Manuel Du Propriétaire

Modèle à gonflage hydrostatique / modèle à gonflage hydrostatique avec harnais de sécurité
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

14) Refold the Inflatable PFD in accordance with the Repacking
section (see Repacking, p. 13).

RePaCking

If your Inflatable PFD has been used and/or the hydrostatic inflator
replaced, always inflate through the oral tube and check that it stays
inflated at least overnight. With the dust cap in the top of the oral
tube, gently squeeze the Inflatable PFD until all air or gas has been
expelled (Fig. 6). Do not wring or twist the Inflatable PFD. Put the oral
tube dust cap back in its stowed position on the oral tube (Fig. 7). let
the Inflatable PFD dry before packing.
iMPoRtant: ensure all air is removed before repacking.
before following the repacking sequence, be sure to
properly re-arm your inflatable PfD, (see Re-arming
Your PfD, p. 9).
Figure 18
Figure 19
A
3) If your inflatable PFD has a black inflator cap cover, ensure the
inflator body is still located within its protective cap cover and that
the single point status indicator is visible through the inflator cap.
13
1) lay out the Inflatable PFD flat
on a clean surface (Fig. 18).
note: the fold lines, on the
diagram, are provided to
assist with packing.
2) Fold side (A) inward along the
full length of the dotted line
(Fig. 19). Fold cover (B) over;
covering side (A) (Fig. 20).
Figure 20
B

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Md3154 v.f.i.

Table des Matières