A.5 Installation And Assembly; A.6 Water Connection; A.7 Electrical Connection - Zanussi ZXLIG Instructions D'installation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 55
ENGLISH
• For machine lifting and anchoring, do not use movable or weak parts such as: casings,
electrical raceways, pneumatic parts, etc.
• Do not push or pull the machine to move it, as it may tip over. Use proper tool to lift the
machine.
• Machine transport, handling and storage personnel must be adequately instructed and
trained regarding the use of lifting systems and personal protection equipment suitable
for the type of operation carried out.
A.5
Installation and assembly
• Follow the installation instruction supplied with the machine.
• Do not install a damaged machine. Any missing or faulty parts must be replaced with
original parts.
• Do not make any modifications to the parts supplied with the machine.
• Disconnect the machine from the power supply before carrying out any installation
procedure. Connect the machine to the power supply only at the end of the installation.
• The machine is not suitable for installation outdoors and/or in places exposed to
atmospheric agents (rain, direct sunlight, freeze, humid and dusty location, etc.).
• Do not install the machine over 2000 meters above sea level.
• Make sure that the floor where you install the machine is flat, stable, heat resistant and
clean.
• Use a ladder with suitable protection for work on machines with high accessibility.
A.6
Water connection
• The plumbing connections must be carried out by a specialised personnel.
• The machine is to be connected to the water mains using the new supplied hose-sets.
Do not use old hose sets.
• Always use a new set of joints if you remove and re-install the water inlet pipe to the
machine.
Before connection to new pipes, pipes not used for a long time, where repair work has
been carried out or new devices fitted (water meters, etc.), let the water flow until it is
clean and clear.
• The operating water pressure (minimum and maximum) must be between:
– 1 bar [100 kPa] and 6 bar [600 kPa];
• Make sure that there are no visible water leaks during and after the first use of the
machine.
• Install an approved dual check valve upstream according to the regulation of the
installation country.
A.7
Electrical connection
• Work on the electrical systems must only be carried out by a specialised personnel.
• Make sure that the electrical information on the rating plate agrees with the power supply.
• Make sure to install the machine in accordance with the safety regulations and local
laws of the country where used.
• If the power cable is damaged it must be replaced by the Customer Care Service or in
any case by specialised personnel, in order to prevent any risk.
• The machine must be correctly earthed. The manufacturer is not responsible for the
consequences of an inadequate earthing system.
• If present, connected the machine to the equipotential protection circuit .
8

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

406402315

Table des Matières