Commissioning
DE
5.4
Changing the Colors of the Actuator Caps
US
FR
IT
ES
RU
NL
DK
SE
▶
Insert a screwdriver into the cut-out and turn it.
▶
FI
Pull the actuator cap out.
▶
Position the new actuator cap and snap it into place.
PT
GR
6
Commissioning
PL
Before commissioning, carry out the following checks:
CZ
▶
Check the enclosure for damage.
SK
▶
Check that mounting and installation have been performed correctly.
▶
HU
Remove any foreign objects.
▶
If necessary, clean the connection chamber.
SL
▶
Check whether all the specified tightening torques have been observed.
RO
BG
7
Maintenance, Overhaul, Repair
LV
▶
Observe the relevant national standards and regulations in the country of use.
LT
7.1
Maintenance
EE
Check the following points in addition to the national regulations:
CH
• Whether the clamping screws holding the electrical lines fit securely
KR
• Whether the device enclosure and/or protective enclosure has/have cracks or other visible
signs of damage
CN
• Whether the permissible temperatures are complied with
• Whether the parts are securely fitted
• Ensure it is being used as intended.
7.2
Overhaul
▶
Perform overhaul of the device according to the applicable national regulations and the
safety notes in these operating instructions ("Safety" chapter).
▶
The only overhaul measure is a periodic inspection for damage and proper operation.
12
LED indicator lamps
for panel mounting
Series 8013/3
11354E00
290430 / 8013608300
2021-06-25·IO00·III·en·00