Mounting and Installation
DE
5.3
Installation of Devices 8013/3.1 into the Panel
US
FR
Opening the terminal cap
Open the terminal cap using a screwdriver with dimensions 0.6 x 3.5 mm/0.02 x 0.14 inch.
IT
ES
RU
NL
DK
SE
▶
Position the screwdriver against one of the locking tabs.
▶
Turn it 90°.
FI
▶
Pull the cap back a little and hold it in this position.
PT
▶
Position the screwdriver against the second locking tab.
GR
▶
Turn it 90°.
▶
Pull the cap off.
PL
CZ
Use flexible cable with an outer diameter of 5 to 9 mm/0.2 to 0.35 inch
SK
HU
SL
RO
BG
▶
Open the cable gland.
LV
▶
Slide the cable through the cable gland.
▶
LT
Pull the cable into the terminal cap.
EE
Prepare the cable
CH
KR
CN
▶
Remove the outer jacket for the length of the cable gland.
▶
Strip off 6 mm/0.24 inch of conductor insulation.
10
LED indicator lamps
for panel mounting
Series 8013/3
11618T00
11612T00
11613T00
290430 / 8013608300
2021-06-25·IO00·III·en·00