Stahl PanSic 8013/3 Série Mode D'emploi page 11

Masquer les pouces Voir aussi pour PanSic 8013/3 Série:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Conductor connection to spring clamp terminals
Cut-away with spring clamp terminals with capacity of 2 x 18 to 2 x 12 AWG (1).
Open the spring clamp terminal with a screwdriver (blade – 0.6 x 3.5 mm/0.02 x 0.14 inch)
by inserting it into the square cut-out and hold the clamp open (2).
Insert the conductor into one of the rounded openings (3).
Remove the screw driver (4).
Closing the terminal cap
Push the terminal cap onto the contact block until it locks into position.
Push the cable towards the cable gland.
Tighten the screw connection nut with approx. 1.2 Nm/11 inch. lbs. torque.
Mounting the device into the panel
Insert the lamp actuator (1) into the installation wall (3) and secure it in place.
Ensure that the seal (2) is seated precisely when doing so.
Insert the indicator lamp from the reverse side into the lamp actuator (1).
Ensure that the indicator lamp and lamp actuator (1) are secured in the installation wall (3).
Use the threaded nut (4) to tighten the lamp actuator (1) against the installation wall (3)
(tightening torque for the threaded nut: 2.5 Nm/0.28 lb/inch).
Position the actuator cap with the desired luminous colour.
290430 / 8013608300
2021-06-25·IO00·III·en·00
11615T00
LED indicator lamps
for panel mounting
Series 8013/3
Mounting and Installation
11617T00
DE
US
FR
IT
ES
RU
11614T00
NL
DK
SE
FI
PT
GR
PL
CZ
SK
HU
SL
RO
BG
LV
LT
EE
CH
KR
CN
04928E00
11

Publicité

Chapitres

Table des Matières
loading

Table des Matières