Section 5 − Installation; Typical Equipment Location; Installing Wire Guides And Drive Rolls - Miller AA40G Manuel Du Propriétaire

Table des Matières

Publicité

5-1. Typical Equipment Location

3
2
1
1
Welding Power Source
2
Gas Cylinder
3
Side Beam

5-2. Installing Wire Guides And Drive Rolls

6
7
Tools Needed:
3/16 in.
SECTION 5 − INSTALLATION
4
Weld Control
5
Spool Support
5
8
9
4
4
6
7
1
3
2
5
6
7
Wire Drive Assembly
Automatic Welding Gun
ST-131 138-A
.
When changing wire size or
type, check drive roll and guide
size (see Table 8-1).
1
Spring Shaft Carrier
Close spring shaft carrier.
2
Drive Roll Nut
3
Drive Roll Carrier
Turn nuts one click to line up lobes
with lobes on drive roll carriers.
Open spring shaft carrier.
4
Drive Roll
Remove drive rolls.
5
Wire Guide Securing Screw
Loosen wire guide screws.
6
Anti-Wear Guide
7
Inlet Wire Guide
Install inlet wire guide into anti-wear
guide, and secure with setscrew.
Install inlet guide so groove is cen-
tered with screw, and secure guide
screw.
8
Intermediate Wire Guide
Insert intermediate guide until
flange is against casting, and se-
cure guide screw.
Install drive rolls, and turn nuts one
click.
9
Drive Assembly Cover
Close cover.
Ref. 150 922 / 802 438-A
OM-200 580 Page 13

Publicité

Table des Matières
loading

Table des Matières