Installing The Template Box; Mounting The Appliance; Installation Instructions - Baxi MS UNIVERSALE+ Instructions D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

The appliance must be installed inside the template box which is supplied in a separate package.
Ensure that the model of the template box is correct.
The template box must be fitted into the wall in a niche created for the purpose (dimensions shown in Figure 1), and blo-
cked with special rag bolts at the sides. Ensure that the installation allows easy maintenance.
The door and the white frame must be removed and fitted only at the end of the installation phase (check that the key for
opening the door is supplied with the box).
The frame allows depth adjustment by turning the 4 wing-nuts on the transverse guides. In this way it is possible to rest
the frame on the plaster and remove it if the wall has to be painted.
Install the system, starting from the position of the water inlets present on the lower and upper bars of the template (recess
in the box: 30 mm).
We recommend installing the box under or close to the boiler. It is advisable to fit shutoff cocks (G3/4") on each inlet
(available on request) to allow maintenance work, if required, without having to drain the entire heating system.
After having completed the masonry work, fix the MS UNIVERSALE+ appliance inside the template box and make the
hydraulic connections (see Figure 2).
Before fixing the module, make the holes in the back wall to insert the Ø 10mm fixtures (use the holes in the template box
as a guide). Then anchor the module with the screws provided.
WARNING: The rectangular head screws in the Box Kit must be replaced with those supplied with the product.

INSTALLATION INSTRUCTIONS

2. INSTALLATION

2.1 INSTALLING THE TEMPLATE BOX

2.2 MOUNTING THE APPLIANCE

17
7225991.02 - en