1. Connect the two pumps with each other with a 3-core
screened cable between the GENIbus terminals A, Y, B.
2. Power on both pumps.
3. Establish contact to one of the pumps with Grundfos GO.
4. Set the needed analog and digital inputs via Grundfos GO
according to the connected equipment and the required
functionality. See section
17.48 Assisted pump
5. Assign a pump name to the pump using Grundfos GO. See
section
17.42 "Pump
name".
6. Assign pump number 1 to the pump. See section
17.30 "Number" (Pump
number).
7. Disconnect Grundfos GO from the pump.
8. Establish contact to the other pump.
9. Set the needed analog and digital inputs via Grundfos GO
according to the connected equipment and the required
functionality. See section
17.48 Assisted pump
10. Assign a pump name to the pump using Grundfos GO. See
section
17.42 "Pump
name".
11. Assign pump number 2 to the pump. See section
17.30 "Number" (Pump
number).
12. Select the "Assist" menu and choose "Multipump setup".
13. Select the desired multipump function. See sections
17.51.1 Alternating
operation,
17.51.3 Cascade
operation.
14. Press [>] to continue.
15. Set the time for pump changeover such as the time at which
the alternation between the two pumps is to take place. This
step applies only if you have selected "Alternating operation,
time" and if the pumps are fitted with FM 300.
16. Press [>] to continue.
17. Select "BUS cable" as the communication method to be used
between the two pumps.
18. Press [>] to continue.
19. Press "Select pump 2".
20. Select the additional pump from the list.
Use the [OK] or
button to identify the pump.
21. Press [>] to continue.
22. Press [Send].
23. Press [Finish] in the "Setup complete" dialog box.
24. Wait for the green indicator light in the middle of Grundfos Eye
to light up.
The multipump system has now been set.
setup.
setup.
17.51.2 Backup operation
and
Advanced control panel and wireless pump connection
1. Power on both pumps.
2. On both pumps, set the needed analog and digital inputs
according to the connected equipment and the required
functionality. See section
17.48 Assisted pump
3. Select the Assist menu on one of the pumps and choose
Setup of multi-pump system.
4. Press [>] to continue.
5. Select Wireless as the communication method to be used
between the two pumps.
6. Press [>] to continue.
7. Select the desired multipump function. See sections
17.51.1 Alternating
operation,
17.51.3 Cascade
operation.
8. Press [>] three times to continue.
9. Press [OK] to search for other pumps.
The green indicator light in the middle of Grundfos Eye
flashes on the other pumps.
10. Press the connect button on the pump which is to be added to
the multipump system.
11. Press [>] to continue.
12. Set the time for pump changeover such as the time at which
the alternation between the two pumps is to take place. This
step applies only if you have selected "Alternating operation,
time" and if the pumps are fitted with FM 300.
13. Press [>] to continue.
14. Press [OK].
The multipump function icons appear in the bottom of the
control panels.
The multipump system has now been set.
setup.
17.51.2 Backup operation
and
55

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Tpe3Tpe2 dTpe3 d

Table des Matières