Beta Motorcycles RR 125 2T EUROPA 2019 Mode D'emploi page 164

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 169
5
Remove the air filter side panel (page
79).
Remove the two screws 1 fastening the
1
tank to the frame and the screw 2 (one per
side) securing the fairing to the radiator.
2
Lift the tank complete with side panels.
Replace the previously removed compo-
10Nm
nents following the disassembly procedures
inversely.
Tighten the tank screws to the torques
given.
7Nm
EN
80

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Rr 125 2t 2019Rr 250 2t europa 2019Rr 3002t europa 2019Rr 250 2t 2019Rr 3002t 2019

Table des Matières