Replacement - Beta Motorcycles RR 125 2T EUROPA 2019 Mode D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 169
4
1
EN

REPLACEMENT

Keep the vehicle in vertical position relative
to the ground.
Replacement of the coolant must take place
when the engine is cold.
- Unscrew cap 1.
- Place a container under screw 2.
- Unscrew the screw 2.
- Drain the liquid.
- Tighten screw 2 applying the specific
washer.
2
- Unscrew drain screw 3.
3
- Proceed to filling.
When filling is completed, purge the
engine group through the screw 4. After
purging, verify the liquid level and top up
if necessary.
When filling is completed, purge the
motor group through the screw 4. After
4
purging, verify the liquid level and top up
if necessary.
- Reapply the loading cap and the bleed-
ing screw.
The amounts of liquid are shown on page
16.
52

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Rr 125 2t 2019Rr 250 2t europa 2019Rr 3002t europa 2019Rr 250 2t 2019Rr 3002t 2019

Table des Matières