Paramount PCC2000 Manuel D'installation page 25

Système de circulation et de nettoyeur de plancher automatique
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

gpm and Step nozzles 5/8 inch = 20 gpm, 3/8 inch = 10 gpm and
1/4 inch = 5 gpm, will need to add up to no more than 55 gallons
per circuit.
On pool start-up, reference the system
design detail sheet for the proper
jets required for each zone. Prior to
installation of the nozzles, install water
valve module and start up equipment
to flush out any remaining debris in the
plumbing lines.
As mentioned previously, the body is provided without the cleaning
nozzle installed. Install the cleaning nozzles with a tool that snaps
into your pool utility pole from outside the pool. Place the floor
nozzle assembly in the body and turn counterclockwise until snug.
NOTE: If the plaster caps came off during the plaster process,
check the floor body for residue before installing the body.
Fig 3
Fig 4
Fig 5
1
2
3
25

Publicité

Chapitres

Table des Matières
loading

Table des Matières