Concrete crew to cut out
sufficient area around the
floor risers, main drain and
down jet lines.
Verify the angle of the risers
as it is imperative that the riser
angle be 90 degrees from the
finished floor angle. Check
that the system did not lose
pressure prior to shooting the
pool and upon completion.
Make a cutout or opening
approximately 1" deep and 1"
bigger than the pipe.
This cutout will be filled with
plaster to create a water stop.

Gunite Or Shotcrete Process

17
Down Jets and step or bench side jets.
Full riser perpendicular to finished shotcrete
in all directions
1" bY 1" CUTOUT
AROUND ThE PIPE FOR
WATER STOP
CUT PIPE hERE
CONCRETE
SOIL
2" ELbOW
Floor
Nozzle
2" PIPE