Ribbed Body Step Installation Guide - Paramount PCC2000 Manuel D'installation

Système de circulation et de nettoyeur de plancher automatique
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

NOTICE: Heavy Body Glue Is Required
1
Make a cutout or opening approximately 1"
deep and 1" bigger than the pipe.
This cutout will be filled with plaster to
create a water stop.
1" bY 1" CUTOUT
AROUND ThE PIPE
FOR WATER STOP
CONCRETE
CUT PIPE hERE
SOIL
2" ELbOW

Ribbed Body Step Installation Guide

2
Cut off riser pipes flush with concrete
surface.
4
2" PIPE
Glue the body into the pipe with a hEAVY
bODY PVC SOLVENT CEMENT.
(IPS WELD-ON 711 or equivalent) The
glue must cover the full length of the
body barrel and 3" deep inside the riser
pipe. Push the body into the pipe until the
shoulder hits the top edge of the pipe.
Let fumes vent for 30 minutes then replace
all body caps.
20
3
Remove cap. Prime the inside of the pipe.
DO NOT PRIME ThE bODY.
DO NOT ROTATE ThE bODY IN
ThE PIPE.
5
PLASTERING THE POOL
Leave all plaster caps in place for removal
at start up.
NOTE: Optional, the plaster crew may
remove the plaster caps as they finish.
NOTE: The body does not come with the
nozzle installed.

Publicité

Chapitres

Table des Matières
loading

Table des Matières