Nozzle Placement - Steps/Benches/Swim-outs
NOTE:
All plumbing in steps, benches, and swim outs should be 2" sch. 40 pipe to
receive the smaller 2" inside step nozzle body.
An in-line check valve is required in all raised spas. Plumb the check valve above ground for ease of future maintenance.
NOTE: All risers in the spa including the floor are 2" risers
Keep in mind that if cleaning nozzles in the spa are part of the cleaning cycle of the swimming pool, consideration must be given to the additional
water being injected into the spa. This water must be removed via dam wall overflow, equalizer line, etc.
When plumbing a spa, it is recommended the nozzles be on a separate port of their own.
NOTE: Separate line with check valve, like Ortega or Jandy, required on raised water features or spas should be serviceable from above the ground.
WATERLINE
POOL
RAISED SPAS
NOZZLE PLACEMENT - SPAS
SPA
2" sch 40 riser
step, benches,
and swim outs
SPRING CHECK VALVE
SHOULD BE SERVICEABLE
FROM ABOVE THE GROUND
12
(Floor only)
WATER
VALVE
SPRING
CHECK
VALVE