Paramount PCC2000 Manuel D'installation page 14

Système de circulation et de nettoyeur de plancher automatique
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

NOTICE: All pipe fittings MUST be staggered.
PARTS NEEDED FOR ASSEMBLY
OPTION ONE
• (3) 2"x12" PVC PIPE (port 2,4,6)
• (3) 2"x15" PVC PIPE (port 1,3,5)
• (1) 2"x18" PVC PIPE (port inlet)
• (4)2"x2 1/4" PVC PIPE (port 1,2,5,6)
• (11) 2" SLIP 90° ELbOWS
• Optional: replace (4) 90° elbows and (4) 2"x2 ¼" pipes with
(4) spigot 90° elbows
• Set in trench 15"deep x 19" wide
height of riser pipes may be adjusted
NOTE:
as long as the 3" height differential between fittings is
maintained.
OPTION TWO
• (2) 2"x12" PVC PIPE (port 3,6)
• (2) 2"x15" PVC PIPE (port 2,4)
• (2) 2"x18" PVC PIPE (port 1,5)
• (1) 2"x21" PVC PIPE (port inlet)
• (2) 2"x2 1/4" PVC PIPE (port 6)
• (8) 2" SLIP 90° elbows
• Optional: replace (2) 90° elbows and (2) 2"x2 ¼" pipes with (2)
spigot 90° elbows (port 6)
• Set in trench 19" deep x 12" wide
IMPORTANT:
PORT 1 AND 5 MUST bE SET AT 15° OFF CENTERLINE IN
ORDER TO CLEAR
Stagger 3" min.
14

Publicité

Chapitres

Table des Matières
loading

Table des Matières