NOTICE: Heavy Body Glue Is Required
1
2
Cut off riser pipes 1-1/2" below concrete
surface. Pipe must be cut square.
4

Ribbed Body Floor Installation Guide

Make a cutout or opening approximately 3"
deep and 1-1/2" bigger than the pipe.
This cutout will be filled with concrete or
plaster to create a water stop.
3
Remove cap. Prime the inside of the pipe.
DO NOT PRIME ThE bODY.
DO NOT ROTATE ThE bODY IN
ThE PIPE.
Glue the body into the pipe with
a hEAVY bODY PVC SOLVENT
CEMENT.
(IPS WELD-ON 711 or equivalent) The
glue must cover the full length of the
body barrel and 3" deep inside the riser
pipe. Push the body into the pipe until the
shoulder hits the top edge of the pipe.
Let fumes vent for 30 minutes then
replace all body caps.
18
5
PLASTERING THE POOL
Leave all plaster caps in place for removal
at start up.
NOTE: Optional, the plaster crew may
remove the plaster caps as they finish.
NOTE: The body does not come with the
nozzle installed.