Télécharger Imprimer la page

Inflating Tubeless Tyres (Ti Versions Only); Troubleshooting - Corghi A 2025 LL Manuel D'utilisation

Masquer les pouces Voir aussi pour A 2025 LL:

Publicité

Les langues disponibles
  • FR

Les langues disponibles

Inflating tubeless tyres
(TI versions only)
WARNING
Before carrying out the operations descri-
bed below, always make sure that there
is no dirt, dust or other impurities on the
jaws near the air outlet holes.
- Make sure that the wheel is secured to
the table top with inside clamping.
- Connect the Doyfe connector on the air
hose to the valve stem.
- Hold the tyre with your hands and lift it
until there is a slight gap between the
lower bead and bottom edge of the rim
in order to close the upper bead and the
top of the rim.
- Fully press the inflation pedal down for a
short period to the bead seating position
Operator's manual A 2025 LL
(fig. 33a). The tyre will expand and the
beads will seat.
- Continue to press the pedal in the infla-
tion position (fig. 33b) until the beads
are completely inserted.
NB: to improve the operation of the tubeless
tyre inflation system the compressed air line
pressure must be between 8/10 bar.
32

TROUBLESHOOTING

Turntable will not turn
Earth line wire.
➥ Check the wiring.
Motor in short-circuit.
➥ Replace the fuses.
➥ Replace the motor.
Rotation control pedal fails to
return to central position
Control spring broken.
➥ Replace the command spring.
Bead breaker pedal and table
top pedal do not return to
Control spring broken.
➥ Replace the pedal return spring.
No oil in lubricator.
➥ Top up lubricator with SAE20 non-
detergent oil.
home position
33a
33b
UK
55

Publicité

loading