BRÖTJE Heizung BK 350 Instructions De Montage page 17

Système de cascade à gaz de fumée
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 19
Fig. 3: Installation instructions for the flue cascade systems BK 350 (Flue outlet at the back)
6
2
5
1
End cover with siphon connection
2
Clamp
3
Tee for flue entry
(for end cover with siphon connection)
4
Tee for flue exit
5
Tee for flue entry
(for end cover without siphon connection)
6
End cover without siphon connection
7308114-01 04.13
7
2
2
4
2
8
10
11
- Apply lubricant to gaskets
- Assemble components as shown in Fig. 3
Note: Route the flue with a fall towards the combustion equipment so the conden-
sate can drain from the flue to the central condensate collector or to the siphon
connection. The minimum fall for a horizontal flue is 3° (5.5 cm/m).
Flue cascade system BK 350
7
2
1
3
8
2
9
7
Eccentric connector 250/350
8
Hose clamp
9
Condensate hose
10
Transition piece
11
T-piece condensate hose
Installation
17
GB

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Bk 350

Table des Matières