Sime Planet Dewy 30 BFT Notice De Montage, D'utilisation Et D'entretien page 11

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

2.8. 1
Installation Methods for IPEX System 636 Type BH PVC or CPVC Gas Venting Systems (for Canada Only)
System 636 PVC or CPVC Type BH Gas
Venting Systems are third party certified to
ULC S636.
The following installation methods have
been prepared in conformity with the requi-
rements of section 4 of ULC Standard
S636.
1. Application
IPEX System 636 PVC or CPVC Gas Venting
Systems are intended for negative or positi-
ve pressure venting of gas fired appliances
producing exhaust gases having temperatu-
res limited to the range specified in 1(a) and
1(b).
(a) System 636 CPVC venting systems are
suitable for temperatures up to and inclu-
ding 90°C (194°F); ULC S636 Class II.
(a) System 636 PVC venting systems are
suitable for temperatures up to and inclu-
ding 65°C (149°F); ULC S636 Class II.
2. Limiting to Use and Application
(a) Improper installation of System 636
PVC/CPVC systems may result in per-
sonal injury or death. Only qualified per-
sonnel should attempt the installation of
gas burning equipment, following the
gas appliance manufactures' directions.
(b) All System 636 gas venting pipe and fit-
ting must be carefully inspected before
use to ensure no damage has occurred
during transportation. Any damaged
product must be replaced. No attempt
at repairs shall be made at the job site.
(c) The common temperature changes in a
gas venting application will cause the
system to expand and contract accor-
dingly, proper care must be taken to
allow for this movement through walls,
ceilings, and roof penetrations. The ven-
ting system must be supported in accor-
dance with these instructions.
(d) Only approved System 636 PVC or
CPVC primer and cement shall be used
to assemble System 636 CPVC venting
systems respectively.
* All IPEX System 636 cements contain
an optical brightener to aid in identifi-
cation during warranty claims.
Note: Follow IPEX solvent cementing proce-
dures as shown in this manual, and check
for proper joint construction when joining
pipe to fittings.
System 636 Pipe, Fittings and Cements
are certified as a system and must be
installed as such. Different
manufacturers have different materials,
joining systems and adhesives. Do NOT
mix pipe, fittings, solvents, or joining
methods from different BH Vent manu-
facturers, this can result in unsafe condi-
tions.
(e) Venting should be as direct as possible
with a minimum number of fittings. The
maximum vertical rise or horizontal run
of vent pipe in a single vent installation
shall not exceed the requirements outli-
ned in the appliance manufacturer's
installation instructions. The total num-
ber of vent fittings in a single vent instal-
lation shall not exceed the requirements
outlined in the appliance manufacturer's
installation instructions.
(f) All framing requirements for floor and
ceiling penetrations shall be in accor-
dance with the local building code
and/or the local regulatory authority.
(g) All penetrations of fire rated floors
and/or walls shall be as required by the
local building code and/or the local
regulatory authority.
All fire stopping of venting shall be com-
pleted using fire stops that are listed by
a recognized agency. Fire stop installa-
tion shall be as per the fire stop device /
system manufacturer's installation
instructions.
(h) Roof penetrations should be sealed with
a plumbing roof boot or equivalent fla-
shing as per the local building code, or
as permitted by the local regulatory
authority.
(i) All framing required in conjunction with
wall and roof terminations shall be in
accordance with the local building code
and/or the local regulatory authority.
(j) WARNING: Insulation shall not interfere
with required clearance spaces.
4. Special System Layout Considerations
(a) Vent piping must be sized according to
the equipment manufacturers' recom-
mendations. IPEX does not recommend
the use of existing vent piping, flues or
chimneys. When old appliances are
replaced, do not connect System 636
venting to existing vent materials.
Replace the entire existing venting
system with ULC S636 listed venting
material. If transitions between ABS,
and PVC or CPVC must be made at the
appliance, only System 636 CPVC/ABS
or PVC/ABS Transition Cement shall be
used. System 636 Primer may only be
used on PVC or CPVC connections. Do
not use Primer on ABS appliance con-
nections.
(b) All horizontal sections of the venting
system must be installed with a slope
not less than 0,8 inch (20 mm) per 40
inches (1000 mm) down towards the
appliance in order to prevent collection
of condensate. Reference the appliance
manufacturers' instructions regarding
installation of necessary condensate
drains.
ENG
FR
11

Publicité

Chapitres

Table des Matières
loading

Table des Matières