Finish Framing - After Appliance Installation - Napoleon Vector Série Manuel D'installation

Masquer les pouces Voir aussi pour Vector Série:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

10.0 fi nish framing - after appliance installation
10.1 framing with non-combustibles
single-sided fl ush
Ceiling
minimum framing
Ref
LV38-1
K
E
F
53 13/16" (136.7cm)
J
Optional - Appliance does not need to be elevated above fl oor
L
73" (185.4cm)
note:
The LV series requires a minimum enclosure/ceiling height, as illustrated (dimension L), measured from the bottom
of the appliance. For temperature requirements, this area must be left unobstructed. Some venting confi gurations
that require more vertical rise will require a larger enclosure to provide minimum vertical clearance between vent
pipes and combustibles.
fi nish framing - after appliance installation
L
J
LV50-2
39 15/16" (101.4cm)
20 1/8" (51.1cm)
65 13/16" (167.2cm)
77 13/16" (197.6cm)
note:
Shaded components (fi nish framing) must be
non-combustible materials.
Finish framing must be built after the appliance has
been placed in its fi nal position and venting
connected.
K
E
F
LV62
LV74
89 13/16" (228.1cm)
91" (231.1cm)
Drywall
Insulation
W415-1709 / D / 06.14.19
EN
45

Publicité

Chapitres

Table des Matières
loading

Table des Matières