Napoleon Vector Série Manuel D'installation page 47

Masquer les pouces Voir aussi pour Vector Série:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

see-thru fl ush
note:
Shaded components (fi nish framing)
must be non-combustible materials.
Finish framing must be built after the
appliance has been placed in its fi nal
position and venting connected.
Drywall
minimum framing
Ref
LV38-1
K
E
F
53 13/16" (136.7cm)
J
Optional - Appliance does not need to be elevated above fl oor
L
73" (185.4cm)
note:
The LV series requires a minimum enclosure/ceiling height, as illustrated (dimension L), measured from the bottom of
the appliance. For temperature requirements, this area must be left unobstructed. Some venting confi gurations that
require more vertical rise will require a larger enclosure to provide minimum vertical clearance between vent pipes and
combustibles.
fi nish framing - after appliance installation
Insulation
LV50-2
39 15/16" (101.4cm)
16 3/16" (41.1cm)
65 13/16" (167.2cm)
77 13/16" (197.6cm)
Ceiling
K
E
F
LV62
LV74
89 13/16" (228.1cm)
91" (231.1cm)
EN
L
J
47
W415-1709 / D / 06.14.19

Publicité

Chapitres

Table des Matières
loading

Table des Matières