Télécharger Imprimer la page

Commissioning And Operation; Checking Functionality Of Cmm (Iq) Easy - Simco-Ion Charge Master Micro IQ Easy Notice D'utilisation

Générateur haute tension cc

Publicité

Les langues disponibles

Les langues disponibles

Note:
To ensure correct and safe operation, the blue core (0 V/GND) of the power cable and the
earth wire must both be connected to earth.
Fig 5, connections CMM IQ Easy (with Simco-Ion IQ Easy platform)

6 Commissioning and operation

6.1 Checking functionality of CMM (IQ) Easy

-
It is recommended that the setpoint for the output voltage first be set to 0 and then
subsequently increased.
-
Switch on the supply voltage (24 V DC).
The LEDs on the generator will quickly flash green during start-up. The CMM IQ Easy will
check whether the Simco-Ion IQ platform or an analogue control is being used during start-
up. They will then flash slowly as long as no setpoint has been set for the high voltage.
Cycle OK output is inactive.
-
Connect 24 V DC to the "Remote On/Off" input or activate the "Remote On/Off" through the
Simco-Ion IQ platform.
Increase the setpoint so that the LEDs light up orange. The high voltage is now active and
Cycle OK will become active when it no longer detects a charging current to the electrodes.
If the CMM is connected as seen in fig. 4 (standard analogue control), the setpoint can be
increased by connecting e.g 7,5 mA (=4 kV) to the setpoint input. Chapter 6.5 describes how
to increase the setpoint of an CMM IQ Easy which is connected to the Simco-Ion IQ
platform.
CMMEasyCMMIQEasy_UM_9752098500_NL_D_GB_F_V3_1
Pin
Name
1
+24 V DC
2
Serial (A)
3
0 V/GND
4
Serial (B)
5
0 V/Earth
Standard core colour
Brown
White
Blue
Black
Yellow/green - Grey
GB
53

Publicité

loading