Safety During Installation; Preliminary Operations And Fastening The Track To The Base - BFT FAUNUS 600 Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

SAFETY DURING INSTALLATION

During installation, please:
- use appropriate tools as specified by these instructions.
- use personal protection equipment (protective goggles, gloves) when working.
- display work in progress signs and do not leave the site unattended.
- do not connect the electrical mains until assembly is completed.
- once the equipment is connected to the mains, only touch the buttons and adjustment devices
necessary to program the unit.
- work and repairs not specified in these instructions are not authorised.

PRELIMINARY OPERATIONS AND FASTENING THE TRACK TO THE BASE

Open the packaging and cut the strap.
1
Position the track opening it in the direction of the arrow.
2
WARNING: make up the track
correctly
AVOID POSSIBLE "STEPS"�
Move the connector to the centre of the first
two rails and lift the tabs as shown in the figure.
Repeat the operation for the second connector.
3
26
- FAUNUS 600 KIT
Tighten the nut with a bush, Ø 10mm, and adjust as instructed in point 5.
4
10 mm
5
Fasten the track to the base.
6
V1
6,3
15
10 mm
39-41 mm
V1
V1

Publicité

Table des Matières
loading

Table des Matières