Assembly Of Track Holding Bracket Onto The Wall; Assembly Of Track Onto The Track Holding Bracket - BFT FAUNUS 600 Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

ASSEMBLY OF TRACK HOLDING BRACKET ONTO THE WALL

The track holding bracket (shown by the arrow) must be installed paying attention to the centre of the sectional door and the measurements shown in the circle.
Fix the track holding bracket as shown in the sequence:
2
1
3
4
F1
V1
R4
F1
Ø10
40
Ø8

ASSEMBLY OF TRACK ONTO THE TRACK HOLDING BRACKET

After installing the track holding bracket onto the wall, fix the track to the bracket as shown:
V5
R4
V2
V2
6
10 mm
80
27
-
FAUNUS 600 KIT

Publicité

Table des Matières
loading

Table des Matières