10.2

Start-up

1. At first start-up, verify that the rotation direction is correct.
2. Check the pump is fed correctly.
3. Start-up the pump without any load.
4. Check that the rotation rpm during operation does not
exceed the nominal rpm of the pump.
5. Let the pump run for a time of no less than 3 minutes,
before putting it under pressure.
6. Before each pump stop, reset pressure by means of the
control valve or with any relieving devices.
Should there be any priming trouble due to
insufficient supply, it is possible to remove the
three plugs in front of the head (except for the
LK36 version) as shown in pos.  Fig. 11.
11

PREVENTIVE MAINTENANCE

For pump reliability and efficiency, comply with maintenance
intervals as shown in the table below.
PREVENTIVE MAINTENANCE
Every 500 hours
Check oil level
*
To replace, follow instructions contained in the Repair
manual.
12

PUMP STORAGE

12.1
Method for filling pump with anti-corrosion
emulsion or anti-freeze solution
Method for filling pump with anti-corrosion emulsion or anti-
freeze solution using an external diaphragm pump based on
the layout shown in par. 9.6:
a) Close the filter drainage, if open.
b) Make sure the connecting pipe is clean, spread with grease
and connect them to the high pressure discharge.
c) Fix the suction pipe to the diaphragm pump, open the
pump suction connection and attach the pipe between it
and the diaphragm pump.
d) Fill the container with solution/emulsion.
e) Insert the free ends of the suction pipe and the high
pressure exhaust pipe inside the container.
f ) Switch on the diaphragm pump.
g) Pump the emulsion until it exits from the high pressure
exhaust pipe.
h) Continue pumping for at least another minute. The
i)
j) Remove the hose from the high pressure exhaust. Clean,
12.2
a) Before greasing and protecting pipes according to
b) Cover with polyethylene.
c) Do not wind too tight, ensure that there are no folds.
13
14
The guarantee period and conditions are contained in the
purchase agreement.
The guarantee will in any case be invalidated if:
a) The pump is used for purposes other than for those agreed
Fig. 11
b) The pump is fitted with an electric or combustion motor with
c) Safety devices are decalibrated or disconnected.
d) The pump is used with accessories or parts not supplied
e) Damage has been caused by:
Every 1000 hours
Change oil
Check / Replace*:
Valves
Valve seats
Valve springs
Valve guides
Check / Replace*:
H.P. seals
L.P. seals
33
emulsion can be strengthened if necessary by adding Shell
Donax for example to the solution.
Stop the pump, remove the pipe from the suction
connection and close with a plug
grease and plug both pipe connections.

Pipes

previously described procedure, dry connections with
compressed air.

PRECAUTIONS AGAINST FROST

Follow the instructions in Chapter 12 in areas and
times of the year at risk of frost (see par. 12.1).
In the presence of ice, do not start the pump
for any reason until the circuit has been fully
defrosted, otherwise there can be serious
damage to the pump.

GUARANTEE CONDITIONS

upon.
performance exceeding those indicated in the table.
by Interpump Group.
1) improper use
2) failure to follow maintenance instructions
3) any use different from that described in the operating
instructions
4) insufficient flow rate
5) defective installation
6) improper positioning or sizing of pipes
7) unauthorised design modifications
8) cavitation.