Installation - Faro SK07 Mode D'emploi

Masquer les pouces Voir aussi pour SK07:
Table des Matières

Publicité

INSTALLATION

On the base of the autoclave packaging are holding points.
Brief handling operations of the equipment can be carried out by two people; the
holding points for lifting the autoclave are positioned on the upper part of the
equipment (18 fi g. 2). For longer handling operations, the pallet supplied should be
inserted under the equipment.
- Take the autoclave out of its packaging.
- Position the autoclave onto its support (table or unit) with the aid of the handles.
- Remove the handles and insert the cover plugs. Keep the handles and their screws for
future handling.
- Open the door by turning the knob 2 in an anti-clockwise direction (fi g. 1) and remove
the accessories supplied from the chamber.
Check that the equipment includes:
- Documentation (instruction manual)
- Tray support
- 3 trays
- 1 tray extraction pincer
- 1 fi lling pipe
- 1 draining pipe
- 1 funnel
- 4 plugs
Plug in the autoclave plug taking care that the cable does not remain squashed and that it
can easily be removed from the socket.
28
THE DEVICE MUST BE INSTALLED BY SPECIALIZED
TECHNICIANS
Check with a spirit level that the resting surface is level in both directions;
if not, level the autoclave using the adjustable front feet.
If the autoclave is to be built in to the unit, the dimensions in fi g. 5 must
be observed.
Check that the power plug used is earthed.

Publicité

Table des Matières
loading

Table des Matières