Stiebel Eltron DHE Connect 18 Utilisation Et Installation page 88

Masquer les pouces Voir aussi pour DHE Connect 18:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION
Commissioning
f Hook the appliance cover at the top rear into the back panel.
f
Pivot the appliance cover downwards. Check that the appli-
ance cover is securely fitted at both top and bottom.
f Tick the selected connected load and rated voltage on the ap-
f
pliance cover type plate (on both sides). Use a ballpoint pen
to do this.
f Secure the appliance cover with the screw.
f
f Fit the fascia to the appliance cover.
f
f Switch the mains power ON.
f
Note
The display activates after approximately 1 minute.
88
|DHE Connect | DHE Touch   
f Check the function of the appliance and the mini wireless
f
remote control.
f Carry out quick commissioning for the most important set-
f
tings. You can also adjust the settings to your needs later via
the "Settings / Standard settings" menu.
11.1.1 Changing the connected load
If you select a connected load other than the 21 kW factory setting
for appliances with selectable connected load, take the following
steps.
Connect the appliance to the mains voltage for the conversion.
Proceed as described in chapter "Commissioning", but switch on
the mains voltage immediately after safety switch activation.
1
1 Connected load button
2 Display
f Press the connected load button briefly to wake up the dis-
f
play. The set connected load flashes.
2
www.stiebel-eltron.com

Publicité

Table des Matières
loading

Table des Matières