Epson V12H949001 Instructions D'installation page 24

Tableau blanc tout-en-un epson/support pour brightlink pro
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

V12H949001 / AN3WA100
5.
Secure wall bracket top covers (J) to wall bracket arms by
installing four #8-32 x 1/2" Phillips pan machine screws (H1)
through holes in covers and wall bracket. (See Figure 59)
6.
Place wall bracket bottom cover (K) over bottom of one wall
bracket arm. (See Figure 58)
7.
Secure wall bracket bottom cover (K) to wall bracket arm by
installing two #8-32 x 1/2" Phillips pan machine screws (H1)
through holes in cover and wall bracket. (See Figure 59)
(H1) x 4
7
(Mount assembly arm not shown for clarity)
Figure 59
8.
Repeat Steps 6 and 7 for remaining wall bracket arm.
9.
Lower AN3 sensor cover (R) over touch sensor, placing
bottom tabs in channel on top of screen frame.
Figure 60)
10. Swing top of sensor cover over top of touch sensor, clicking
it into place. (See Figure 60)
[side view]
Bottom
tab
Channel
in screen
frame
Figure 60
24
(H1) x 4
5
(See
9
(R)
10
9
11. Separate the two pieces of the cable channel (DD).
12. Remove paper from adhesive on the back piece, and attach
cable channel back to wall vertically between the projector
mount assembly and the touch sensor cover. (See Figure 61)
13. Lay cables on cable channel back and snap cover into place
over the cables. (See Figure 61)
14. Run cables behind screen frame and down along side of
screen.
Figure 61
NOTE:
Installation is complete.
Installation Instructions
(DD)

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

An3wa100

Table des Matières