V12H949001 / AN3WA100
Installing Screen
(U)
(T)
Back of
screen (Y)
IMPORTANT ! : Use at least two people when lifting and
installing screen. Handle the frame and back of screen,
and avoid touching the front of screen as much as
possible.
1.
Lay box flat and open.
2.
Stand screen up and add leveling feet (GG) to each corner on
the back of screen (Y). Do not over tighten. (See Figure 14)
3.
Hang screen (Y) onto screen mounting bracket (T), placing
slots in bracket on back of screen over tabs on screen
mounting bracket (T). (See Figure 14)
NOTE:
Keep screen parallel to wall when hanging onto screen
mounting bracket (T).
12
3
Slots
3
Tabs
2
4
Bracket attached
to screen (Y) back
Screen mounting
bracket (T)
attached to wall
Figure 14
IMPORTANT ! : Ensure that cables are placed over the
projector during installation of screen, and then along the
side of the screen so that they are accessible for later
steps of the installation.
4.
Level screen against the wall by placing a level against the
front of screen and adjusting the leveling feet.
5.
Continue to adjust until screen matches wall's vertical
plane.
Installation Instructions
[View from behind wall]
(GG) x 4
[View from front]
3
Slots
Tabs
3