4.3
Coffee preparation with coffee beans
Ready
4.4
Coffee preparation with powdered coffee
(e.g. decaffeinated coffee, 2
BASL - 02 - V01
4.3.1
A precondition is that
the machine is ready for op-
eration according to point
4.1
Initial operation, i.e. the tank is
filled with water, the bean con-
tainer is filled with beans, the
temperature control display
is illuminated in green and the
display message "Ready" is
displayed.
4.3.2
Place the cup under
the beverage outlet and press
the desired product button.
The machine is equipped with
an automatic pre-brewing sys-
tem. The coffee powder is only
moistened, the outlet is briefly
stopped and then the actual
brewing cycle begins.
Note:
At any time you may terminate
coffee delivery by briefly
pressing the selected dis-
penser button. Large mugs or
coffee glases can be used as
well. Loosen the lock and push
the beverage outlet upwards.
(after use place the outlet back
to its usual position.)
If you would like to draw 2
cups simultaneously, first
press the
button and then
the desired product selection
button.
nd
type of coffee)
Attention:
Never use water-soluble,
freeze-dried instant coffee or
similar products. Never spoon
more than maximum 1 or 2
level measuring spoonfuls of
ground coffee into the filling
funnel. The filling funnel is not
designed to hold a permanent
supply. The ground (e.g. de-
caffeinated) coffee you put into
the coffee maker is funneled
directly into the brewing sys-
tem.
4.4.1
Press the
button
for powdered coffee, the red
monitoring indicator (8a) lights
up.
4.5
Hot water preparation
Ready
User manual
4.4.2
After you have placed
the cup below the beverage
outlet now also press the re-
quired product button. The
display message "Powdered
coffee" appears and the red
monitoring indicator (8a)
blinks.
4.4.3
Remove the lid of the
charging hopper for powdered
coffee and place a max. of 1
or 2 level measuring spoons of
powdered coffee for 1 or 2
cups in the hopper (use the
supplied measuring spoon).
Then press the
button for
powdered coffee once again.
The coffee process operates
automatically.
Note:
If for about 2 minutes after
pressing the powdered coffee
button no additional product
button is pressed, the red
monitoring indicator for pow-
dered coffee extinguishes it-
self. In this case press the
powdered coffee button once
again and press the relevant
product button.
4.4.4
If you would like to
draw 2 cups simultaneously,
first press the
button, and
then the powdered coffee but-
ton and then the required pro-
duct selection button.
4.5.1
For example for tea or
bouillon etc., it is precondi-
tioned that the machine is
ready for operation according
to point 4.1, i.e. the water tank
and bean container are filled,
and the temperature control
display
shows a green
light. The display message
"ready" is shown.
4.5.2
Place the glass or cup
under the hot water nozzle
and press the
button. The
hot water now flows out auto-
matically.
Note:
At any time, you have the op-
tion to prematurely terminate
the output by pressing the se-
lected product button.
Page 39
UK