GB
13. Line up the End Frame Sections with each end of the Screed. Ensure that the tube on the End Frame connects with the Air Tube on
the Screed Section (See Image 13)
14. Remove the ttings from the air pipe of the Screed Sections where the Vibrating Pot has just been removed (detailed in Item 10)
(See Image 14)
15. Next, unwrap the 2 x Bungs which are taped to the End Frame Sections. Screw into the air pipe where the ttings have just been
removed (See Image 15)
13
16. Start at one end of the Screed and tighten all loose bolts until you reach the other end of the Screed.
NOTE:- Long Vibration Pot Bolt (1/2" UNF) should be tightened to a minimum of 135Nm
Short Vibration Pot Bolt (1/2" UNC) should be tightened to a minimum of 123Nm
17. Straighten the Screed using String Line (See Below)
GB
To string line your Pro Screed, there are a few important steps that needs to be followed.
1. Place each end of the Screed on a plank of wood or another similar type of support.
2. At approximately 1" out from the leading edge of the Screed Blade, drive a nail into the wooden support.
NOTE:- Nail should be on the outside edge of the wooden support.
3. Stretch a line as tight as possible from nail to nail. Make sure that the nail is contacting each support at the point of blade contact.
NOTE:- The support do not have to be on the same level.
4. Use a short, at piece of metal or wood as a gauge block to compare the string to the bottom surface of the Screed Blade.
5. The Blades should be equal to each other at each splice. If they are not even, loosen the Jam Nuts and tighten top pipe coupler
NOTE:- Always String Line your Screed before each pour to ensure that you get the desired atness and levelness rating.
Assembly Instructions - Pneumatic
14
String Lining
16
15