Health And Safety; Pre-Start Checks - Altrad BELLE PRO SCREED Manuel De L'opérateur

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

Vibration
Some vibration from the compaction operation is transmitted through the handle to the operator's hands. The Altrad Belle Porto-Screed
has been speci cally designed to reduce hand/arm vibration levels. Refer to Technical Data section for vibration levels and usage times
(recommended maximum daily exposure time). DO NOT exceed the maximum usage times.
PPE (Personal Protective Equipment).
Suitable PPE must be worn when using this equipment i.e. Safety Goggles, Gloves, Ear Defenders, Dust Mask and Steel Toe capped
footwear (with anti-slip soles for added protection). Wear clothing suitable for the work you are doing. Tie back long hair and remove
and jewellery which may catch in the equipment's moving parts.
Electric Models
Electricity
Electricity can kill ! Always ensure that the machine is disconnected from the power supply before carrying out any maintenance /
repairs.
Pneumatic Models
Air
Air under pressure can be highly dangerous and can kill ! Always ensure that all connections are tight and the hoses will not 'snake'
before turning on the air supply. (i.e when you turn the air on the hoses might move quite violently).
Petrol Models
Fuel
Do not ingest fuel or inhale fuel vapours and avoid contact with your skin. Wash fuel splashes immediately.
If you get fuel in your eyes, irrigate with copious amounts of water and seek medical attention as soon as possible.
Exhaust Fumes.
Do not operate the machine indoors or in a con ned space, make sure the work area is adequately ventilated.
CAUTION
Pre start-up inspection
The following Pre-start-up inspection must be performed before the start of each work session or after every four hours of use,
whichever is rst. Please refer to the service section for detailed guidance. If any fault is discovered, the machine must not be used
until the fault is recti ed.
1. Thoroughly inspect the machine for signs of damage.
2. Check hoses, ller openings, drain plugs and any other areas for signs of leakage. Fix any leaks before operating.
3. Petrol - Check the engine oil level and top up as necessary.
4. Petrol - Check the engine fuel level and top up as necessary.
5. Petrol - Check for fuel and oil leaks.
6. Electric - Check the entire length of cable for damage. Replace if necessary.
7. Pneumatic - Check in line oiler level. Re ll as required.
Health & Safety
The exhaust fumes produced by this equipment are highly toxic and can kill!

Pre-Start Checks

9
GB
GB

Publicité

Table des Matières
loading

Table des Matières