Installation - Palazzetti A78 Manuel D'installation, D'utilisation Et De Maintenance

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

• Re-assemble the fixing bolts removed previ-
ously.
• Re-connect the display cable connector, with
its relative mass, to the board and the power
cable.
• Push the machine to the end position of the
guides, paying attention to any interference
caused by the cables. Then group these cables
together through the application of a tie.
• Open the door, insert the Allen key (1) in the
004778890 - 12/11/2021
ITALIANO
stop release seat; turn the locking lever clock-
wise to position (2) to lock the guides.
Fig. 29
• Close the door
7.2.2 Installation of generator with stand
(A78/AC78)
In the event of installation in structures with
marble cladding or other materials, the insert
has sliding guides to assist with extracting the
equipment for attaching to the fixing surface
Fig. 30
and for carrying out inspections and checks on
the mechanical and electrical components.
The stand is supplied in model AC78 while it is
optional in model A78.
• Once the pallet has been removed (refer to par-
agraph: "HANDLING AND TRANSPORTATION")
proceed as follows:
• Adjust the height of the stove by turning the
bolts (A) on the stand uprights.
• Level the frame by screwing or unscrewing the
gooseneck feet (B).
• The lower edge of the stove must be at least 1
cm above the marble top of the cladding.
• Drill 4 Ø 8 holes for securing of the frame to the
ground. Use the frame itself as a template.
• Secure the feet (B) of the base with sturdy Ø 8
mm steel expansion plugs (C).
Fig. 31
ENGLISH
FRANÇAIS
Fig. 32
67

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Ac78

Table des Matières