Gardeo GRO24V20PROG Traduction Des Instructions Originales page 49

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

2.Installation of Fence Line:
A)The fence line starts under the charging station, wiring in the anticlockwise direction along the
lawn edge. It ends at the back side of the charging station.
B)The fence line must pass through the middle of the charging station, and forward at least 2
meters (A).
C)The slimmest distance of wirings must be at least 1.5 meters interval. (B).
D)The fence line corner must have an inner angle of at least 125 o .
E)When there is a fixing facility or flower and tree in the lawn, isolate it as semi-ring-like island
or ring-like island with the fence line to avoid any hit. The diameter of the ring-like island is
no more than 1.5meters
2 mètres
F)Except the front 2 meters of the fence line from the charging
station, the distance of the rest fence line to the lawn edge is
not less than 30cm.
G) Fix the fence line tightly against the ground with the provided pegs. It is recommended
that the pegs are inserted every 2-3 meters. The pegs can be put even closer each other if the
ground elevation differs greatly.

Publicité

Table des Matières
loading

Table des Matières