grandimpianti C 200/51 Instructions Pour L'installation Et Mode D'emploi page 49

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 1
First start-up
At the first start-up, ensure that the machine is stable and level.
Check that all the connections and exhausts are appropriately completed.
Check the satisfactory earthing of the machine.
Turn the lockable selector on the left panel to position 1 and check that the start light
of the micro-processor is on.
Press the START button.
Check the rotation and correct direction of the demister extraction ventilators (arrow
on the motor).
Check the rotation and correct direction of the belts (rotation towards the inside of
the machine).
Attention: take care not to touch or approach a moving part.
Re-assemble all the housings on the machine.
Check the temperature settings of the unit.
Adjust the temperature setting (or steam input pressure) according to the laundry to
be ironed.
Proceed with the ironing tests; the laundry must come out dry and perfectly pressed.
If not, increase the temperature or slow down the ironing speed.
Attention: as the cylinder is paraffined as it leaves the factory, carry out a first ironing test
with old laundry.
DOC MACHINE Ø50.0-EN by PS on 19/06/2015,
Page 15 of 33

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

C 260/51C 330/51

Table des Matières