It is obligatory to install a check valve system for each of the machines before
reaching the header manifold.
The connections must be Y-shaped; never T-shaped.
Increase the section before connection so that the final section is the sum of the two
previous ones.
Assembly and installation process
In order to be able to take the machine through a door of 0.90 metres, the tubs must be taken
out. In order to do this, proceed as follows:
Unscrew the 4 screws located inside the tub. Remove the tub.
Simply take out the input tub by removing it from its casing (pay attention to the guiding
springs fixed at the top).
Attention: take care not to let go of the handle on the panel to the right.
Level the machine correctly.
Remove the top panel, loosen and then take out the screws and the red U-shaped
flanges used to wedge the cylinder.
Note:
keep the screws and flanges for subsequent servicing.
Transport
flange
DOC MACHINE Ø50.0-EN by PS on 19/06/2015,
Page 14 of 33