52
AVENTICS | MC | 1987765452–BDL–001–AE
Conversion and extension
≤3
Fig. 7:
Manual override
5.2
Commissioning
Observe the following points during commissioning:
Before switching the system on, ensure that it is in a defined state!
Make sure that all manual overrides are set to zero.
1. Switch on the operating voltage.
2. Switch on the compressed air supply.
6
Conversion and extension
6.1
Occupying reserve positions
If free valve positions (subplates that are closed by dummy plates)
are to be equipped at a later date, carry out the following steps.
Please note the following:
O
Turn off the system operating voltage and compressed air.
O
When mounting, ensure that all contacts are straight and
that all gaskets have been correctly inserted.