Shutting Down The Unit; Process Of Shutting Down The Unit; Disconnecting The Wiring In Push-In Type Terminals - Ingeteam INGECON SUN STORAGE 1Play TL M Manuel D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Ingeteam

20. Shutting down the unit

This section describes the procedure to shut down the unit.
CAUTION
If you wish to work inside the unit, you must carry out these instructions in the order shown here to remove the
power.

20.1. Process of shutting down the unit

1.
Stop the inverter manually using the On/Off button on the control panel or from the web application
2.
Remove both the direct voltage (Vdc) and the alternating voltage (Vac) arriving at the unit.
3.
Wait 10 minutes for the internal capacitances to discharge, the hot parts which may cause burns to cool
and the fan blades to stop turning.
4.
Check there is no voltage.
5.
Signal cut-off point (Vac and Vdc) with a sign reading ¨Caution no switching...¨. If necessary, rope off the
work area.

20.2. Disconnecting the wiring in push-in type terminals

INFO
The connection of the critical loads, the consumption grid and the auxiliary grid/genset is performed using
push-in type terminals.
Section
"7. Connection/disconnection of wiring in push-in type terminals"
disconnecting the wiring from this type of terminal.
60
describes the process for
ABH2014IQM01_A- Installation and Operation Manual
Shutting down the unit

Publicité

Table des Matières
loading

Table des Matières