Yamaha 25J Manuel D'entretien page 104

Table des Matières

Publicité

INSP
ADJ
PERIODIC SERVICE
4. Fill the PTT unit with hydraulic fluid.
Recommended hydraulic fluid:
ATF Dexron II
5. Install the reservoir plug.
Reservoir plug:
7 Nm (0.7 m • kgf, 5.1 ft • lb)
HYDRAULIC SYSTEM AIR BLEEDING
NOTE:
The PTT unit cannot be bled manually. The
power tilt must be operated during the
bleeding procedure.
1. To close the manual valve, turn it coun-
terclockwise.
2. Connect the battery leads to the battery.
3. Push the PTT switch so that the tilt rod
moves up and down.
PTT switch
UP
DN
4. Move the tilt rod up and down several
times until it moves smoothly.
3-21
E
Direction
Tilt up
Tilt down

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

30d25x30x

Table des Matières