Ingeteam INGECON SUN 3Play Série Manuel D'installation page 92

Masquer les pouces Voir aussi pour INGECON SUN 3Play Série:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 175
Ingeteam
3.
The connection is made via the PCB terminal. Wire the three phases to the terminals marked R (Vac3),
S (Vac1), T (Vac2). Wire the neutral to the terminal marked N and wire the ground conductor to the
terminal marked as PE.
4.
To make the connection, strip a 20 mm section of the cable. Using a tubular terminal is optional.
5.
Screw in the terminal with a torque of 5.5 Nm.
6.
Use a cable tie to secure the cable to the plastic support for this purpose; avoid pulling on the cable.
7.
Secure the packing gland, again avoiding tightening the conduit.
The AC conduit must remain without voltage while the unit door is open.
CAUTION
Respect the installation of N and PE. Do not interchange with the phases.
Ingeteam accepts no liability for any consequences of incorrect connection.
92
ABO2011IQM01_C - Installation and Operation Manual
AC connection

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Ingecon sun 3play 11tlIngecon sun 3play 20tlIngecon sun 3play 33tlIngecon sun 3play 11tl mIngecon sun 3play 20tl mIngecon sun 3play 33tl m ... Afficher tout

Table des Matières